Oilfield Development
|
At present we are working at 87 various oil and gas fields in Russia with annual production of approximately 90 mln tons including:
-
36 fields in Khanty-Mansiysk autonomous district, Western Siberia;
-
12 fields in Nenets autonomous district;
-
8 fields in Komi Republic;
-
13 fields in Perm;
-
18 fields in Lower Volga, Volgograd region.
Current Projects:
-
Total E&P Russia Retrofitting CGP on Khariyaga field
-
PLC «LUKOIL-West Siberia» Interfield pipelines construction - over 560 km; GTPP-48 megawatt on Povkhovskoe Field; Compressor station on Filippovskoe Field
-
PLC «LUKOIL-Komi» Interfield pipelines construction - over 290 km; Oil treatment plant (OTU) on Kyrtaelskoe Field; Preliminary water removal unit construction on Passhorskoe Field
-
PLC «LUKOIL-Perm» OTU «Pavlovka» revamp; Gas pipeline to Yayvinskaia GRES power plant
-
PLC «Intensifikatsiya i PNP» Gas and Condensate gathering facilities on Yuzhno-Kislovskoye Gas Condensate Field; Complex gas treatment plant (CGTP)
-
PLC «Volgodeminoyl» Field development in Volgograd region
-
OJSC «RITEK» Revamp of Oil pipeline from Booster Compressor station «Makarovskaya» to SP-3 Linevo
-
OJSC ANK «Bashneft» Construction of infield pipelines on R.Trebsa and A.Titov Field

|
|
|
Completed Projects during the last years:
-
6000 km of flow pipelines (dia. from 114 to 720 mm);
-
Over 1400 km of high-voltage power lines (from 6 kV up to 35kV);
-
Over 250 km of interfield and infield roads with hard surface;
-
6 gas compressor stations with 350 - 1.200 m3/yr capacity;
-
19 booster pumping stations (BPS) and 6 oil preparation units (OPU) with 1.5 tо 5.0 mln tons per year capacity;
-
Carried out over 10 mln cub. m. of Hydro-powered soil inwash
-
PLC «LUKOIL-Uzbekistan Operating Company» Field development in Hauzakskiy assets of Dengizkulskaia Group of fields
-
Carrying out a Gas Programm of OJSC NK «LUKOIL»
-
PLC «LUKOIL-Komi» OTU «USA Tyajelaia neft» with 2 mln t/yr capacity of oil
-
PLC «LUKOIL-West Siberia» Pyakiahinskoe Field development Stock tanks for LPG storage
-
Total E&P Russia Khariyaga Field development - I stage
-
Neste Oil Construction of Oil Treatment & Storage Complex of Yuzhno-Shapkinskoe Field and Khariyaga-Usinsk oil pipeline
-
OJSC NK «LUKOIL» Oil treatment plant (OTU) on Varandey Field
|
|