Construction of Pipelines and Terminals

 

  • Engineering and construction of main pipeline systems;
  • Welding, mechanical and coating works during installation of pipelines;
  • Start-up, commissioning and maintenance works.

 

Current Projects:
  • «Khariyaga - Yuzhnoye-Hylchuyu» Complex of oil transportation and «Inzyrey Khariyaga» gas pipeline, customer is Business Unit «Severneftegaz», - over 200 km and terminal facilities;
  • Gas pipeline from Yuzhno-Kislovskoye Gas Condensate Field to «Bykovo-Volzhsky» gas pipeline branch. Junction point to «Bykovo-Volzhsky» gas pipeline branch for PLC «Intensifikatsiya i PNP»;
  • Capital revamp works on PLC «Gazprom Transgaz Yugorsk» gas pipelines in Tyumen region.
Gas pipeline

Completed Projects:
  • Varandey Oil Shipment Terminal (VOST) with 12 mln tons per year capacity, including 4 tanks with 50 thous. cub. m capacity;
    Offshore oil pipeline (32”, length - 47 km) at Varandey Oil Shipment Terminal Complex;
    Oil pipeline CGP «Yuzhnoe - Hylchuyu» - Offshore tank farm «Varandey» (20”, length 162 km);
  • Oil Distribution–Transshipment Complex (ODTC) in Vysotsk with 14.5 mln. tons/year capacity, including 19 tanks with 20 thous. cub. m capacity;
  • «Caspian Pipeline Consortium» Oil Pipeline System - «Теnghiz-Novorossiysk» pipeline (40”, length - 45 km) and Oil-loading Terminal, Novorossiysk (Tank Farm with 4х100 thous. cub. m capacity);
  • «Sakhalin-1» Project. Маin export oil pipeline from OPF Chayvo and Odoptu to De-Kastri Terminal (24” and 36”, total length 362.9 km). Crossing over Chayvo Bay and Val river made by Horizontal Directional Drilling (HDD) method;


  • Sakhalin-2» Project. Маin surface oil and gas pipelines (20”, 24” and 48”, total length - 1640 km);
  • Capital revamp works on main gas pipeline systems of PLC «Gazprom Transgaz Yugorsk»in Tyumen region. Replacement and re-coating of 56” pipes, with total length of 400 km;
  • First start-up complex of oil-product pipeline «Perm-Аlmetyevsk-West» (16”, length 350 km);
  • Inlet and outlet gas pipelines at Sosnogorsk Gas Processing Plant (GPP) (28” – 40”, length – 17.4 km);
  • Маin oil pipeline «Yuzhnо-Shapkinskoye Field – Khariyaga Terminal», on supports and with heating systems (12”, length - 105 km);
  • Маin gas pipeline «Nakhodka field - GCS 1 - Yamburg» ((40”, length – 94.2 km) with underwater crossing over Tazovskaya Bay (48”, length – 22.6 km);
  • Main gas pipelines for commercial and fuel gas (28” and 8”, length - 45 and 50 km), condensate pipeline (8”, length – 45.5 km). Pipelines of 2 – 13”, total length 50 km.
    «Construction of facilities of Hauzak Denghizkul field» Project in Republic of Uzbekistan;
  • Tanks with 50 thous. cub. m capasity for «LUKOIL Neftochim Burgas» AD;
  • Маin gas pipeline system «Yamal - Еurope» (56”, total length 450 km);

 

 