Construction of Industrial facilities
- Installation of process and electrical equipment;
- Process pipelines;
- Welding and installation works of process and electrical engineering equipment.
| Current Projects: |
-
PLC «UralVagonZavod» scientific industrial corporation» - Special manufacturing revamp works.
-
OJSC «GAZ» - Set of works on CSSK PLA project.
-
OJSC «Mordovacement» - New department of clinker milling.
|
| Completed works: |
-
OJSC «VMZ» Revamp of ТESTs-4 for pipes’ production with dia up to1420 mm with corrosion-proof coating (370 thous. tons of pipes per year), Vyksa, Nizhegorodskaya region. Section of out-of-furnace treatment of open-hearth steel for railway wheels production (390 thous. tons of steel per year), Vyksa, Nizhegorodskaya region.
-
CJSC «Izhora pipe-making plant» Pipe production complex, dia up to 1420 mm, wall thickness up to 40 mm and length of 18 m, including step forming press of 1700 tons, 6500 ton-force and capacity of up to 15 pipes per hour, «Megalift» unit of load-lift capacity up to 540 tons - 2006.
|
 |
-
OJSC «Моrdovacement» New process train for clinker production by dry pressing method - 2300 tons per day. Revamp of Vankinsky quarry of Alekseyevsk cement raw material deposit.
-
OJSC «Uliyanovskcement» Installation of electric filter unit "3429" at cold end of Rotary Kiln No.1.
|
 |
-
OJSC «GAZ» Installation and adjustment of equipment for conveyer production of «Volgа Siber» cars - 65 000 cars per year, Nizhniy Novgorod – 2008.
-
PLC «UralVagonZavod» scientific industrial corporation» Construction of the off-site networks and facilities; Industrial water conduct of No.1 area.
|
 |
|